Alternative Plans Review and Inspection Forms. endstream
endobj
359 0 obj
<>/Subtype/Form/Type/XObject>>stream
However, Section 101 of the IECC has a clause that has been widely interpreted and understood to give a building code official or jurisdiction the latitude to allow any compliance approach that "makes sense" with respect to accomplishing the code's objectives. A supporting documentation index must be provided along with the COMcheck - the tabular . %R
The problem most likely relates to the basement walls you have specified. Various types of work sites require different safety evaluations and protocols. How is Cavity and Continuous Wall Insulation Calculated in REScheck? (D) COMcheck versions. The file is saved but I cannot get a pdf or rtf file to print. COMcheck-Web June 16, 2022 releaseaddresses the following: COMcheck Desktop Version 4.1.5.5addresses the following: COMcheck Supported Codes -- both platforms: COMcheck Supported Codes -- COMcheck-Web only: OFFICE of Users who have unique wall assemblies where the cavity is not completely filled with insulation must account for the air space within their wall assembly calculation and should use other as the wall type and enter their respective overall calculated U-factor. If no sheathing is indicated by the user, the sheathing is assumed to be plywood with an R-value of 0.83. H23U0t.=s#0ag
Louisiana Office of State Fire Marshal
In COMcheck 4.0.0.3 and newer, you can now break up your VRF into two systems. Note: There is an allowance for up to 1% of wall area in recessed equipment in walls in Standard 90.1 if 90.1 is the code in which you are complying with. If the total heat loss (represented as a UA) through the envelope of your building does not exceed the total heat loss from the same building conforming to the code, the software generates a report that declares your building is compliant with the code.
To be effective, a checklist needs to be specific to the type of . f The expense of bringing an existing building up to code can be very costly especially if portions have to be completely rebuilt to accommodate insulation. 0 0 0 rg f endstream
endobj
374 0 obj
<>/Subtype/Form/Type/XObject>>stream
For more detailed information on how the walls are calculated please refer to the REScheck Technical Support Document. endstream
endobj
324 0 obj
<>/Subtype/Form/Type/XObject>>stream
endstream
endobj
371 0 obj
<>/Subtype/Form/Type/XObject>>stream
REScheck works by performing a simple U-factor x Area (UA) calculation for each building assembly to determine the overall UA of a building. View a list of supported software versions for code compliance tools. However, reports submitted are frequently incomplete. Walls with insulation R-values equal to or less than R-15 are modeled in REScheck as having 2x4 studs at either 16" or 24" O.C. Access Agreement for Construction and Maintenance. This checklist is intended for use to prepare for an inspection. Application for Modification of Sidewalks Standards.
If the user does not enter a continuous insulation (sheathing) Rvalue (or enters a value of 0.0), the software assumes a sheathing Rvalue of 0.83. But if there are certain areas of a workplace or specific activities that are high risk or changing rapidly, more frequent inspection may be justified, for example on a construction project. Please check back here regularly for updates and announcements concerning the State Fire Marshal's Plan Review section.
Permit Forms | Eugene, OR Website 2. A plumbing permit is required forCommercial dryer installation. Depending upon the type of permit and work to be performed, you may establish an inspection at the time of permitting, or by calling the Inspections Department at 817-222-7730. Help Desk inquiries submitted during this time will be answered the first week of January. Simply click on ultimate home inspection checklist below to get your downloadable guide: Foundation, Structure, and Exterior The basis of any house inspection checklist comes down to getting the foundation and structure properly assessed. When continuous foam insulation is specified, 100% of the wall is assumed to be covered at the specified R-value. Locate the lighting fixture library in this location defaulted by COMcheck: Copy fixtureLibrary.xml from this location to the same directory on the other computer. A: Valid Liability Insurance good for at least 30 Days. endstream
endobj
343 0 obj
<>/Subtype/Form/Type/XObject>>stream
0 0 0 rg the files are of a different size than anticipated. 1000 Independence Ave. SWWashington DC 20585. 1.68 1.68 6.6 6.6 re 0
H23U0t.=s#0ag REScheck uses nominal insulation R-values. BECP's team of building energy codes experts is available to answer specific questions submitted through our web-based help desk.
Chesterfield County, Virginia The 2009/2012 editions of the IECC (commercial provisions) do not include language explicitly describing a defined envelope trade-off compliance method. endstream
endobj
330 0 obj
<>/Subtype/Form/Type/XObject>>stream
(1x3X20i
X `1eaDbcKJPs!,=0x0.*))91fd``3plY~7iI;SR'N:gi&59{akCO/oW7wG'g[;{K+kS3sC#c]=}
M-mU5uE%eY9y I)iQ1qA!a^>~N.nV6vf&cSi&p00yAp G9
New homes or residential accessory structures, remodel or conversion of existing buildings or additions to existing buildings. ALL systems in a project must meet the criteria of C406.2 and if your system(s) cannot be found in C406.2 then by default it does not qualify.
PDF Simplified Building Method Mechanical - Oregon f endstream
endobj
344 0 obj
<>/Subtype/Form/Type/XObject>>stream
All NFRC ratings are based on the whole product, including the frame.. %R
4. The program does not calculate for compression. 2. One option is to share the log in credentials with them and save all edits to the project under that account. The trade-off methodology used by COMcheck is consistent with the "Normative Appendix C: Methodology for Building Envelope Trade-Off Option" found in the referenced ASHRAE 90.1 code. The U.S. Department of Energy (DOE) is directed to provide technical assistance to states to support the implementation of model residential and commercial building energy codes (42 USC 6833). To help the development community adjust to the new procedure, Building Code Enforcement hosted an online workshop to explain the: Inspection checklist which follows the compliance certificates; Importance of the comment section When entering doors in COMcheck, do I use "operable U-factor" or "caclulated U-factor? endstream
endobj
370 0 obj
<>/Subtype/Form/Type/XObject>>stream
PDF TO: SUBJECT: INFORMATION BULLETIN 221 DATE: Revised January 2019 Create your signature and click Ok. Press Done. below-grade wall: that portion of a wall in the buildingenvelope that is entirely below the finish grade and incontact with the ground. Mechanics must be certified to perform Annual Vehicle Inspections. He and Benjamin were able to let us know the ins and outs of the home. Within COMcheck, a user is required to choose the code option of "2015 IECC" unless 2015 IECC section C401.2 Item 1 is applied which would then allow the application of ASHRAE 90.1-2013, in which case . However, reports submitted are frequently incomplete. The forms generated by the software can be submitted for both the Prescriptive and Simplified Trade-Off paths. Visualizing the physical systems and structures from roof to floor, home inspection can literally save you from expensive headaches. Do electric central furnaces qualify for the High Performance HVAC Efficiency package in the 2012 IECC? COMcheck-Web - 2009 IECC Code/Location Code: State: City: If your location is not included here, choose a nearby location with similar weather conditions. Fire & Emergency. Administrative Review Minimum Submittal Requirements and Checklist Page 1 of 1 .
Roles and Responsibilities in the Commissioning Process endstream
endobj
startxref
This may mean more insulation on the rest of the wall, better windows, or more roof insulation.
A license is not required to obtain building permits for commercial projects. Permit for repairing a residential or commercial structure damaged by fire or other catastrophic event. Building Inspection Apply Online Using the Enterprise Land Management (ELM) Portal The Enterprise Land Management (ELM) citizen access portal assists in completing functions across Community Development departments for planning, zoning and development, permitting and inspections, utility connections and code enforcement. REScheck-Web Version 2.1.0, September 14, 2021 releaseaddresses the following: REScheck Desktop Version 4.7.2 addresses the following: OFFICE of 2017 Washington DC Energy Conservation Code is now supported, Slab on grade tradeoffs no longer allowed in RES, Massachusetts State Energy Code no longer supported (as of version 4.7.2.1), State Energy Codes: Florida (2017), Massachusetts, New York City, DC, Denver, Puerto Rico, Utah (2012), Vermont. endstream
endobj
358 0 obj
<>/Subtype/Form/Type/XObject>>stream
Does the COMcheck inspection checklist qualify as a supporting documentation index? 1. Some energy codes don't enforce compliance with VRF systems. (The upload features requires you to be logged into your account. All commercial submittals must include this completed form along with all applicable documents . assigned the default values in Section A7.1. The methodology used to calculate compliance is taken from ASHRAE Appendix C. When an assembly is chosen from the drop down lists in the program, there is a U-factor automatically displayed for that assembly (excluding fenestration). 1.68 1.68 6.6 6.6 re endstream
endobj
388 0 obj
<>/Subtype/Form/Type/XObject>>stream
NOTE: Once these weather files are downloaded they will remain on the PC at C:\ProgramData\COMcheck\eplus\weather. Building commissioning is a team effort that requires the involvement of numerous stakeholders in the process of delivering a successful building project. Only the New York State versions of the COMcheck forms are permitted. f A DIY home inspection checklist can help you examine homes to purchase during the buying process's preliminary phases. The following forms will assist certification. So, if you have a warehouse that is strictly just a warehouse (unconditioned), confirm with the code official as to whether the building envelope must meet the energy provisions even if you are complying to an older code. Inspections for this program are handled by Home Ener gy Rating company, except that Section R403, entitled "Systems," of the 2015 IECC must be verified by the local construction of fice. The checklist should be used as a tool to aid the inspection process and not as a rigid rule. f Note that it will not be added to COMcheck Desktop -- all new Codes moving forward will only be added to COMcheck-Web as eventually the Desktop version will become unsupported. H23U0t.=s#0ag Individual roles, most of which, ideally, are assigned at the predesign phase, and continue from inception through occupancy. Exception: Buildings conforming to Section 506, provided sections 502.4, 503.2, 504, 505.2, 505.3, 505.4, 505.6 and 505.7 are each satisfied. Listed below are some links, documents, and . %R
M -APPENDIX G - MINIMUM PERIODIC INSPECTION STANDARDS |49 CFR 396.19(a) (1), M -INSPECTOR QUALIFICATIONS CERTIFICATION |49 CFR 396.19, M -BRAKE INSPECTOR QUALIFICATIONS CERTIFICATION |49 CFR 396.25, V -ANNUAL VEHICLE INSPECTION RECORD |49 CFR 396.21, Driver License Document Requirements and Fees, Title VII - Equal Employment Opportunity/Civil Rights Compliance, ANNUAL DRIVERS CERTIFICATION OF VIOLATIONS, DRIVERS ROAD TEST CERTIFICATE OR EQUIVALENT, HRS OF SERVICE FORM/ FIRST OR INTERMITTENT DRIVERS, SUMMARY OF HOURS WORKED AND HOURS AVAILABLE, DRIVER OFF DUTY LETTER FOR LUNCH OR BREAK, DRIVERS TIME RECORD (100 OR 150 MILES EXEMPTIONS), APPENDIX G - MINIMUM PERIODIC INSPECTION STANDARDS, BRAKE INSPECTOR QUALIFICATIONS CERTIFICATION, ANNUAL CERTIFICATE OF VIOLATIONS AND REVIEW OF DRIVING RECORD FORM, VEHICLE INSPECTOR AND BRAKE INSPECTOR QUALIFICATION FORM, HANDOUT FOR FAILED SAFETY AUDIT NE SA CAP TEMPLATE 2012, HANDOUT FOR FAILED SAFETY AUDIT NE EA CAP TEMPLATE 2012, Criminal Justice Services Information Division, Trip and Fuel Permits Applications IFTA & IRP, Unified Carrier Registration (UCR) Information, Drug and Alcohol Testing Compliance for Carriers and CDL Drivers, Federal Code: CFR 49 - Federal Regulations.
Navigate to the file on your PC and when selected click Upload. (on center) and cavity wall insulation R-values greater than R-15 are modeled as 2x6 studs at either 16" or 24" O.C.
45 Best Vehicle Checklists (Inspection & Maintenance) - TemplateLab See if your state or county can use COM check to show compliance. wall: that portion of the building envelope, including opaquearea and fenestration, that is vertical or tilted at an angle of 60degrees from horizontal or greater. You can take the help of checklist templates, in case you have a kind of template in mind to create the perfect checklist.
PDF 2015 IRC Mechanical Final checklist - MyBuildingPermit If VRF isn't found in the energy code being used it is because it is not enforced by that energy code. Spaces shall be assumed to be conditioned spaces and shall comply with the requirements for conditioned spaces at the time of construction, regardless of whether mechanical or electrical equipment is included in the building permit application or installed at that time. When determining compliance to one of the IECC codes the minimum skylight requirement will be enforced through the envelope report inspection checklist and the WWR and SRR requirements will be enforced prescriptively. Additionally, a bond is required for sidewalk/culvert/driveway permits. endstream
endobj
329 0 obj
<>/Subtype/Form/Type/XObject>>stream
endstream
endobj
395 0 obj
<>/Subtype/Form/Type/XObject>>stream
However, Standard 90.1 requires whole product ratings in accordance with NFRC 100. The intent of the IECC commercial code is explicitly defined here: "C101.3 Intent. Consequently, for compliance with Standard 90.1, door U-factors must be: Both the NFRC 100 and the Section A7.1 values are for the overall door area, including the door slab and the door frame. The classifications . When clicking check compliance the program displays an error message that REScheck could not complete performance alternative calculations.
PDF Energy Inspection Summary - Texas Department of Licensing and Regulation H23U0t.=s#0ag Additionally, it is advised that you visit the Taps & Meters Section to ensure there is available water and wastewater for your project.
Required Documents Submittal Review - Brownsville, TX 1.68 1.68 6.6 6.6 re The Charlotte Fire Department's Fire Prevention Bureau employs full-time plan reviewers responsible for reviewing and approving all construction documents. Note: REScheck Desktop only supports compliance through the 2015 IECC. hb```g``~$^30 Pc3Y0gK4ySOX4!muVla+;JK*2*2kss[6^8w&C8U ;p00 q@,2A|AD'Y*bU{Fu~)n`? endstream
endobj
326 0 obj
<>/Subtype/Form/Type/XObject>>stream
Enforcement of COMcheck Requirement - Houston Permitting Center 0 0 0 rg Residential construction. When determining compliance to one of the ASHRAE 90.1 energy codes, COMcheck will enforce the WWR and SRR per guidance from Appendix C. However, the minimum skylight area requirement as described in Appendix C is worded and interpreted in such a way as to be deemed not applicable therefore is not enforced in COMcheck for either 90.1 or IECC energy codes. U-factor assembly calculations are taken from ASHRAE Appendix A and ASHRAE Fundamentals. Page 1 of 6 Inspection Checklist Residential Mechanical Final July 2016 This Inspection Checklist reflects code requirements of the 2015 International Residential Code (IRC), 2015 Uniform Plumbing Code (UPC), and 2015 Washington State .
COMcheck-Web - Energy Codes Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software See below for the text. ASHRAEs definitions for these types: space: an enclosed space within a building. endstream
endobj
396 0 obj
<>/Subtype/Form/Type/XObject>>stream
The insulating values of other parts of the building assembly (e.g., gypsum board and air films) are accounted for by the program and should not be included. They represent very poorly performing doors, which can be an issue for some buildings if the door area is a significant fraction of the wall area. Step 2: Goals and Objectives endstream
endobj
360 0 obj
<>/Subtype/Form/Type/XObject>>stream
(Pick up application on the 1st floor). COMcheck input for uninsulated balconies on page BE-11 of the Supporting Documents How-To Guide. View. 5.0 1,089 reviews. COMcheck is the U.S. Department of Energy commercial energy compliance software tool that determines whether a new commercial building, high-rise residential building, commercial building addition or alteration meets the requirements of IECC prescriptive based paths or ASHRAE Standard 90.1. 472 0 obj
<>stream
endstream
endobj
351 0 obj
<>/Subtype/Form/Type/XObject>>stream
During Tree Inspection.
In these cases if you want to use the electric central furnace then you have to choose a different additional efficiency package. H23U0t.=s#0ag To obtain a permit the following documentation is required (but not limited to): Download the Commercial Plan Review Prerequisiteschecklist.
Alex Marshall 2 months ago. Working with that manyenvelope components in COMcheck is unreasonable, which is why we identify surfaceswith similar characteristics and aggregate them during the import process. %%EOF
Does my building need to comply with the energy code if it will not be cooled or heated? For example, if R-19 is entered as the cavity insulation R-value, it assumes the full R-19 in REScheck. Data filename: S:\2014\Jobs\014-013 DCG-Vehicle Maintenance Facility Expansion\Calcs\HVAC\COMcheck\DCG Mechanical COMchedk.cck Page 1 of 2 COMcheck Software Version 3.9.4 Mechanical Compliance Certificate 2012 IECC . Currently we only focus on importing envelope components. English. f
Ryan did an outstanding job with walking me through the home and outside post his hole inspection. K B:0Bhwb9,kz&.Y/.Y;@hggk7L.%ATgI5Am}r gypboard on the interior. 1.68 1.68 6.6 6.6 re The other 20% is assumed to be covered with plywood. ]bO>2Is(?4olPl;c:}q9MUDF'Sontl,Q0PM5l=C5N Um20u kE00[
aP1p$P0* DHD[x&bu6LXrrA| D = DRIVER FILES V = VEHICLE FILES O = OFFICE FILES M = MECHANIC EMPLOYEE FILES FORM NAMEREGULATION CODEOCCURS All building permit applications and plan submissions must be completed online. Q 5: What do I need to have, for a Commercial Inspections? 1.68 1.68 6.6 6.6 re
COMcheck Desktop for Windows may be downloaded and installed directly to your desktop. Brochure for Building Plan Review and Inspection Under Wisconsin's Commercial Building and Heating Codes . EMC H23U0t.=s#0ag New buildings, remodel or conversion of existing buildings or additions to existing buildings. Checklist Inspections. H23U0t.=s#0ag Plan reviews required: Structural, Stormwater and Flood, if applicable. Excepting COMcheck support for 90.1-2013 and 2015 IECC, the envelope trade-off methodology used by COMcheck is the "Normative Appendix C: Methodology for Building Envelope Trade-Off Option" found in the referenced ASHRAE 90.1 code. In Climate Zones 3-8, a space may be designated as either semi-heated or unconditioned only if approved by the building official.
Also, the air leakage rates changed. These commercial buildings shall meet either the requirements of ASHRAE/IESNA Standard 90.1, Energy Standard for Buildings Except for Low-Rise Residential Buildings, or the requirements contained in this chapter.
REScheck | Building Energy Codes Program The COMcheck trade-off alternative used for enforcing the IECC is permitted under a clause in Section 101 (referencing 2012 IECC).
Commercial plan review is required if you are in the corporate city limits of Houston and are planning to erect a commercial building or structure, or are adding to existing commercial building or structures. H23U0t.=s#0ag Older codes did not require the building envelope to meet the energy provisions if the warehouse didn't include mechanical equipment and was unconditioned. Choose My Signature. As part of this assistance, the DOE Building Energy Codes Program provides ongoing support for REScheck and COMcheck compliance software, which are updated based on new editions of the model codes. House inspection is an all-inclusive and comprehensive form of examination of a home using a house inspection checklist. ESCheck CompliR ance Checklist - approved for design . (See also the Department's "UCC Plan Review Checklist" for additional requirements.) To receive updates from the Building Energy Codes Program, including newsletters, articles, compliance tool updates and more, subscribe to the BECP mailing list. Equipment shall meet the minimum efficiency requirements of Tables C406.2. Box 40 Chesterfield , VA 23832-0040 Phone: (804) 748-1057 Fax: (804) 717-6080 Internet: chesterfield.gov . (>3 stories) multi-family buildings. Because your team completes these inspections every single day, it's easy to become complacent and start going through the motions. Within COMcheck, a user is required to .
Inspections of the workplace - HSE H23U0t.=s#0ag ASHRAE offers an exception tothe 40% limitation that calculates the partial shading provided by permanent opaque projections (Refer to ASHRAE 90.1-2007 Sections 5.5.4.2.1 and 5.5.4.4.1, Exception (b)). 2015 IECC Component Performance Alternative is used for 2015 IECC and state codes based upon this code. As such, the Louisiana State Uniform Construction Code Council (LSUCCC) has adopted the 2015 editions of the I-codes. This list contains greater de tail as to what is submitted with a building permit package.
All exterior walls are assumed to be of regular rectangular shape with an average wall height of 9 ft., and the wall width is calculated from the gross area as input by the user. endstream
endobj
380 0 obj
<>/Subtype/Form/Type/XObject>>stream
1.68 1.68 6.6 6.6 re endstream
endobj
379 0 obj
<>/Subtype/Form/Type/XObject>>stream
endstream
endobj
392 0 obj
<>/Subtype/Form/Type/XObject>>stream
The Scope and Application sections of the 2009 IECC address use of ASHRAE 90.1 (2007) as an alternative. How does COMcheck calculate percentage of glazing?
PDF Plan Review- COMcheck for a Simple Commercial Building 2015 IECC and 9 REScheck is appropriate for insulation and window trade-off calculations in residential detached one- and two-family buildings and multi-family buildings three stories or less in height above grade, such as apartments, condominiums, and townhouses. Decide on what kind of signature to create.
Photographs involve general view and a detailed close-up of the condition of an area. H23U0t.=s#0ag Forms and Fees.
DSPS Energy - Wisconsin Step 1: Choose a Checklist Template Firstly, choose a template that you think is the perfect fit for the kind of checklist you are creating. The other VRF system you would specify is from the cooling equipment side of the HVAC systems dialog and is called "VRF Zone Fan Unit". H23U0t.=s#0ag Independent controls for each space (switch/occupancy . 0 0 0 rg COMcheck is a nationally recognized software program to show compliance for International Energy Code Compliance for commercial building projects. A COMcheck Plan Review/Inspection checklist.
We provide both Residential and Commercial services. Review input and edit as necessary.. H23U0t.=s#0ag 0 0 0 rg
Workplace Safety Inspection Checklist: Definition and How To - Indeed COMcheck can be used for commercial buildings or high-rise (>3 stories) multi-family buildings. City of Houston. Part III lists the responsibilities of review for the designer and licensed design professionals and . 0
Department of Building Inspection 9800 Government Center Pkwy P.O. COMcheck, or equivalent IECC energy compliance documentation . This includes above- andbelow-grade walls, between floor spandrels, peripheral edgesof floors, and foundation walls. Before submitting your building plans for review visit the Planning and Development Department, Subdivisions Section for a development plat review.
PDF FREQUENTLY ASKED QUESTIONS - New York City %R
Energy Code Compliance Inspections. 0 0 0 rg
Planning and Development - Forms - Houston It is appropriate to use ASHRAE 90.1 as an alternative when your building exceeds 40% glazing, although it does not guarantee your building will comply. Document Name. %R@PBL1X Kh
What is COMcheck? - Therm-All ID (referring to the Energy Code Provision Number) 2. Are projects required to be completed by a registered design professional? f Why am I receiving an error message that the check envelope compliance simulation failed? (b) that air from heated or cooled spaces is intentionally transferred (naturally or mechanically) into the space at a rate exceeding 3 air changes per hour (ACH) (e.g., atria). 2022 Oregon Fire Code. endstream
endobj
368 0 obj
<>/Subtype/Form/Type/XObject>>stream
Building Energy Codes Program is a resource of the U.S. Department of Energy's Building Technologies Office. endstream
endobj
366 0 obj
<>/Subtype/Form/Type/XObject>>stream
endstream
endobj
346 0 obj
<>/Subtype/Form/Type/XObject>>stream
All supporting documents for these paths can be accessed from the Tools and Reference Materials section at the bottom of this webpage. endstream
endobj
321 0 obj
<>/Metadata 98 0 R/Pages 318 0 R/StructTreeRoot 143 0 R/Type/Catalog/ViewerPreferences 418 0 R>>
endobj
322 0 obj
<>/MediaBox[0 0 612 792]/Parent 318 0 R/Resources<>/Font<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI]/XObject<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>>
endobj
323 0 obj
<>/Subtype/Form/Type/XObject>>stream
This process is done in conjunction with other related trades with the Mecklenburg County Land Use and Environmental Services Agency (LUESA).
%R
Depending on the size of your building, a gbXML file can potentially containthousands of surfaces to fully represent your structure.
endstream
endobj
382 0 obj
<>/Subtype/Form/Type/XObject>>stream
Download via the link at the bottom of the right sidebar. "LR@PBPBLM, k
This kind of clause is often referred to as a "deemed to comply" approach. 1002 Washington Ave., 3rd floor
COMcheck | City of Oregon City %R
(49 CFR 396.19) Respond to complaints regarding many code violations. You can also use it to examine your home and plan annual maintenance. f Also users have the option to choose "other" as the assembly type. Owner, project engineer, contractor, date of construction. endstream
endobj
361 0 obj
<>/Subtype/Form/Type/XObject>>stream
Announcements. hbbd```b``+@$#,D2,`5>qF8s`808~|&azLjHxgfk I6pz`T 2! Q5. Next is the applicable energy code.
endstream
endobj
354 0 obj
<>/Subtype/Form/Type/XObject>>stream
H23U0t.=s#0ag One copy of structural calculations sealed by engineer of record Structural special inspection certificate Per the requirements of Senate Bill 1598, this permit application is: . It is installed on the interior, exterior, or is integral to any opaque surface of the building envelope. Where special conditions exist, the code official is authorized to require necessary construction documents to be prepared by a registered design professional. endstream
endobj
342 0 obj
<>/Subtype/Form/Type/XObject>>stream
However, a license is required for other trade permits such as for fire alarms, fire sprinklers, electrical, plumbing, and mechanical work.
PDF Checklist for Compliance with Section 503 of the Rehabilitation - DOL